Tìm hiểu & Tài nguyên
Tăng cường tính toàn vẹn của tài sản: Kiến thức có thể hành động từ Nhóm PetroBot. Bí quyết về Robot và Kỹ thuật ăn mòn của các Kỹ sư của chúng tôi.
Guides for inspection, robotics, data and visualization teams
Inspection Knowledge Hub
Technical notes for asset owners and inspection engineers working with robotic NDT, field data and reporting workflows.
Pressure Vessel CUI Inspection in Vietnam
A valid UT reading at one opening leaves the neighboring jacketed shell unexamined. Use the vessel's CUI history to choose openings, verify thickness results and hand off the gaps.
- Tie each proposed opening to a named vessel zone, credible water-entry path and inspection decision.
- Photograph jacket and insulation as found; a stain or failed seal is a clue, not a wall-thickness result.
- Map exposed coating and steel before cleaning, then record every change made for examination.


Tank Shell UT Mapping in Vietnam
A tank-shell thickness spreadsheet is only as strong as its location record. Map every valid UT result—and every blocked or rejected location—to a named course, plate, elevation and permanent circumferential datum.

Piping Elbow UT Mapping in Vietnam
A straight-run thickness trend cannot speak for an unmeasured elbow. Give the fitting its own coordinate system, prove each UT response, expand around credible lows and report every surface the probe or crawler could not cover.

Sootblower Erosion Inspection in Vietnam | Boiler-Tube UT
Sootblower and fly-ash erosion follow impact direction, not the easiest inspection route. Map the exposed tube faces, use remote visual evidence to target valid UT, and keep every blocked row or rejected response visible.

UT Corrosion-Rate Trending in Vietnam
Before subtracting two UT readings, prove they describe the same metal under a compatible measurement setup. Control location, validity, coverage, physical changes and inspection history first.

Pipe Support Corrosion Inspection: Vietnam
Plan pipe-support and trunnion corrosion inspections with focused visual checks, valid UT coverage, clear no-data zones and qualified follow-up.

External Floating-Roof Tank Inspection: Vietnam
Build a decision-ready external floating-roof inspection plan that separates visual observations, qualified UT readings, coverage gaps and roof-integrity decisions.

Dead-Leg Corrosion Inspection in Vietnam | Robotic UT Mapping
A practical dead-leg corrosion inspection workflow for mapping risk features, UT coverage, valid readings and exclusions beyond sparse spot checks.

Underwater Tank Inspection: Vietnam | ROV + UT
A practical underwater tank inspection workflow using ROV video, local cleaning and UT spot readings, with clear coverage and hygiene controls.

Internal Pressure Vessel Inspection in Vietnam | RVI and UT
Plan internal pressure vessel inspection with MagRover RVI and UT gridding, including data quality, safety limits and underground-vessel considerations.
Page 1 of 2
All inspection guides
Bài đăng trên LinkedIn
Theo dõi nguồn cấp dữ liệu LinkedIn của chúng tôi để biết thông tin hàng ngày về những đổi mới và thành công của dự án của PetroBot. Chúng tôi chia sẻ những hình ảnh có sức ảnh hưởng, nội dung hậu trường và thông tin cập nhật nhanh chóng thể hiện kiến thức chuyên môn kỹ thuật của chúng tôi trong thực tế.
Spotify Podcast
Hãy theo dõi "Asset Intelligence" để nghe trực tiếp từ các kỹ sư của chúng tôi trong các cuộc trò chuyện chuyên sâu, thẳng thắn. Chúng tôi phân tích khoa học phức tạp về robot và sự ăn mòn, chia sẻ những câu chuyện thực tế và hiểu biết sâu sắc từ lĩnh vực này.