التعلم والموارد
تعزيز سلامة الأصول: المعرفة العملية من فريق بتروبوت. خبرة في الروبوتات وهندسة التآكل.
Guides for inspection, robotics, data and visualization teams
Inspection Knowledge Hub
Technical notes for asset owners and inspection engineers working with robotic NDT, field data and reporting workflows.
Pressure Vessel CUI Inspection in Iraq
A valid UT reading at one opening leaves the neighboring jacketed shell unexamined. Use the vessel's CUI history to choose openings, verify thickness results and hand off the gaps.
- Tie each proposed opening to a named vessel zone, credible water-entry path and inspection decision.
- Photograph jacket and insulation as found; a stain or failed seal is a clue, not a wall-thickness result.
- Map exposed coating and steel before cleaning, then record every change made for examination.


Tank Shell UT Mapping in Iraq
A tank-shell thickness spreadsheet is only as strong as its location record. Map every valid UT result—and every blocked or rejected location—to a named course, plate, elevation and permanent circumferential datum.

Piping Elbow UT Mapping in Iraq
A straight-run thickness trend cannot speak for an unmeasured elbow. Give the fitting its own coordinate system, prove each UT response, expand around credible lows and report every surface the probe or crawler could not cover.

Sootblower Erosion Inspection in Iraq | Boiler-Tube UT
Sootblower and fly-ash erosion follow impact direction, not the easiest inspection route. Map the exposed tube faces, use remote visual evidence to target valid UT, and keep every blocked row or rejected response visible.

UT Corrosion-Rate Trending in Iraq
Before subtracting two UT readings, prove they describe the same metal under a compatible measurement setup. Control location, validity, coverage, physical changes and inspection history first.

Pipe Support Corrosion Inspection: Iraq
Plan pipe-support and trunnion corrosion inspections with focused visual checks, valid UT coverage, clear no-data zones and qualified follow-up.

External Floating-Roof Tank Inspection: Iraq
Build a decision-ready external floating-roof inspection plan that separates visual observations, qualified UT readings, coverage gaps and roof-integrity decisions.

Dead-Leg Corrosion Inspection in Iraq | Robotic UT Mapping
A practical dead-leg corrosion inspection workflow for mapping risk features, UT coverage, valid readings and exclusions beyond sparse spot checks.

Underwater Tank Inspection: Iraq | ROV + UT
A practical underwater tank inspection workflow using ROV video, local cleaning and UT spot readings, with clear coverage and hygiene controls.

Internal Pressure Vessel Inspection in Iraq | RVI and UT
Plan internal pressure vessel inspection with MagRover RVI and UT gridding, including data quality, safety limits and underground-vessel considerations.
Page 1 of 2