Pembelajaran & Sumber Daya
Mendukung Integritas Aset: Pengetahuan Praktis dari Tim PetroBot. Keahlian dalam Robotika dan Rekayasa Korosi.
Guides for inspection, robotics, data and visualization teams
Inspection Knowledge Hub
Technical notes for asset owners and inspection engineers working with robotic NDT, field data and reporting workflows.
Tank Floor UT Gaps in Indonesia | PetroBot
The floor map needs more than thickness points. Show where UT failed beside a weld, where the route stopped and who will examine each gap.
- A plate reading describes its measured point; it cannot clear the neighboring weld.
- Keep a failed UT response as a rejected attempt, never as accepted thickness.
- Open-plate coverage says nothing about a recessed sump or an annular arc beyond the route.


Fixed-Roof Tank Inspection in Indonesia
A plate UT reading cannot clear the vent curb or the seam beside it. Map the fixed roof by zone, qualify the data and give every gap a follow-up method.

Pressure Vessel Nozzle UT in Indonesia
A valid shell UT reading beside a nozzle leaves the neck, weld and blocked quadrants unanswered. Map each feature, reject weak responses and assign the gaps to follow-up.

Cooling Tower Basin Inspection: Indonesia
A clear patch beside the basin outlet says little about the floor behind a baffle. Map the deposits, valid measurements and gaps before deciding what needs cleaning or a drained look.

Pressure Vessel CUI Inspection in Indonesia
A valid UT reading at one opening leaves the neighboring jacketed shell unexamined. Use the vessel's CUI history to choose openings, verify thickness results and hand off the gaps.

Tank Shell UT Mapping in Indonesia
A tank-shell thickness spreadsheet is only as strong as its location record. Map every valid UT result—and every blocked or rejected location—to a named course, plate, elevation and permanent circumferential datum.

Piping Elbow UT Mapping in Indonesia
A straight-run thickness trend cannot speak for an unmeasured elbow. Give the fitting its own coordinate system, prove each UT response, expand around credible lows and report every surface the probe or crawler could not cover.

Sootblower Erosion Inspection in Indonesia | Boiler-Tube UT
Sootblower and fly-ash erosion follow impact direction, not the easiest inspection route. Map the exposed tube faces, use remote visual evidence to target valid UT, and keep every blocked row or rejected response visible.

UT Corrosion-Rate Trending in Indonesia
Before subtracting two UT readings, prove they describe the same metal under a compatible measurement setup. Control location, validity, coverage, physical changes and inspection history first.

Pipe Support Corrosion Inspection: Indonesia
Plan pipe-support and trunnion corrosion inspections with focused visual checks, valid UT coverage, clear no-data zones and qualified follow-up.
Page 1 of 2